Our Products

Rotary Evaporator

Laboratory equipment

Jacketed Reactor

Contact Us

We Cherish All Interactions

Maintenance Planner Skills - Zippia

Maintenance Planner Skills - Zippia

May 18, 2020 · Here's how Preventative Maintenance is used in Maintenance Planner jobs: Coordinate the development of all required regulatory, company, and general practice routine and preventative maintenance procedures and schedules.; Job Responsibilities included: Daily and weekly preventative maintenance preparation, budget control through part ordering and project management planning.

Description of Petroleum Refining Processes and Related .

Description of Petroleum Refining Processes and Related .

Jun 15, 2016 · Solvent Dewaxing. Solvent dewaxing is used to remove wax from either distillate or residual basestocks at any stage in the refining process. There are several processes in use for solvent dewaxing, but all have the same general steps, which are: (1) mixing the feedstock with a solvent, (2) precipitating the wax from the mixture by chilling, and (3) recovering the solvent from the wax and .

Guide for Source Inspection and Quality Surveillance of .

Guide for Source Inspection and Quality Surveillance of .

Oct 24, 2015 · participating in scheduled source inspection work process events, filing nonconformance reports and source inspection report writing. The "Checking" part, covered in Section 8.7, involves looking back at all the source inspection activities that occurred in the Planning and Doing segments to see

Fluid catalytic cracking - Wikipedia

Fluid catalytic cracking - Wikipedia

Fluid catalytic cracking (FCC) is one of the most important conversion processes used in petroleum refineries.It is widely used to convert the high-boiling, high-molecular weight hydrocarbon fractions of petroleum crude oils into more valuable gasoline, olefinic gases, and other products. Cracking of petroleum hydrocarbons was originally done by thermal cracking, which has been almost .

Fluid Catalytic Cracking (FCC) in Petroleum Refining .

Fluid Catalytic Cracking (FCC) in Petroleum Refining .

FCC Reliability and Maintenance . Because of the importance of the FCCU to the profitability of a refinery, considerable effort has been made to improve the reliability and stream factor for the process. Over the years, the average size of the FCCU has steadily increased. Worldwide, the average is over 40,000 B/D while the US value tops 55,000 B/D.

Other Refinery Operations - Joboilfield

Other Refinery Operations - Joboilfield

Turnaround. A planned complete shutdown of an entire process or section of a refinery, or of an entire refinery to perform major maintenance, overhaul, and repair operations and to inspect, test, and replace process materials and equipment. acuum Distillation

Jock Cockburn - Lead Planning Engineer - PETROINEOS .

Jock Cockburn - Lead Planning Engineer - PETROINEOS .

Preplan and track execution of catalytic reformer unit reactor replacement (4 off) & minor overhaul consisting of 121 individual workpacks totaling 16000 manhours. This broke down to 7000 project manhours for the replacement of the reactors, including the coordination of 8 heavy lifts & 9000 manhours of maintenance activities.

glass reactor china

glass reactor china

China Rotary Evaporator manufacturer Glass Reactor . Rotary Evaporator Glass Reactor Molecular Distillation Equipment manufacturer supplier in China offering High Precision Ck6130 Ck6132 Mini Small Metal CNC Lathe Machine for Small Parts Ck6136V Double Mountain Guide Stepless Speed Change CNC Lathe Machine Hot Sale Widely Used CNC Lathe Machine Cak6160 with GSK Controller and so on

Refinery Plant Turn around; objectives, procedures .

Refinery Plant Turn around; objectives, procedures .

Jan 17, 2016 · Definition: In petroleum refining, turnaround means a scheduled large-scale maintenance activity wherein an entire process unit is taken off stream for an extended period for comprehensive revamp .

Team Members Archive | Becht

Team Members Archive | Becht

Steve Tiek has over 30 years of experience in refinery construction, maintenance, and turnarounds, based on his long-term career with Motiva. His experience includes project management, plant engineering, business development and refinery maintenance with an emphasis on areas of turnaround planning, management, and field execution.

Energy Assurance Daily

Energy Assurance Daily

Energy Assurance Daily, December 13, 2016 2 DOE, DHS Release Joint U.S.-Canada Electric Grid Security and Resilience Strategy December 12 The White House on Monday announced the publication of the Joint United States-Canada Electric Grid Security

PREM KUMAR - Senior Mechanical Project Engineer - HIAP .

PREM KUMAR - Senior Mechanical Project Engineer - HIAP .

• Planning and scheduling maintenance work order backlogs and contribute actively to eliminate it by identifying work orders to be performed or re-scheduled. • Representing in routine maintenance, unplanned/emergency works, turnarounds, project events from initial planning, resources and material preparations and maintain the reports.

ind brochure - LinkedIn SlideShare

ind brochure - LinkedIn SlideShare

Jan 15, 2015 · ind brochure 1. Industrial Measurement Division Warner Land Surveys Ltd have been carrying out industrial measurement and critical interface dimensional control works for major refinery shutdowns, both nationally and internationally, for over 18 years.

PREM KUMAR - Senior Mechanical Project Engineer - HIAP .

PREM KUMAR - Senior Mechanical Project Engineer - HIAP .

• Planning and scheduling maintenance work order backlogs and contribute actively to eliminate it by identifying work orders to be performed or re-scheduled. • Representing in routine maintenance, unplanned/emergency works, turnarounds, project events from initial planning, resources and material preparations and maintain the reports.

Oman lets contract for Sohar refinery unit revamp | Oil .

Oman lets contract for Sohar refinery unit revamp | Oil .

Oman Oil Refineries & Petroleum Industries Co., has let a contract to MAN Diesel & Turbo SE, Augsburg, Germany, for work related to the overhaul and revamp of the residue fluidized catalytic .

Petroleum Refinery Enforcement Manual

Petroleum Refinery Enforcement Manual

----- LIST OF FIGURES 2-1 Typical processing steps in a petroleum refinery 2-4 4.1-1 Typical crude oil distillation unit 4.1-2 4.2-1 Reactor/regenerator portion of a fluid catalytic cracking unit 4.2-2 4.2-2 Fractionator portion of a fluid catalytic unit with two risers 4.2-3 4.2-4 Moving-bed (airlift) catalytic cracking unit 4.2-4 4.2-5 Points of emissions from moving-bed catalytic cracking .

The Fire Next Time? | Houston Press

The Fire Next Time? | Houston Press

Apr 18, 1996 · Last September 11, a pair of computers in Exxon's Baytown refinery stopped talking to each other for 15 seconds. That brief lapse in communication caused more than 66,000 gallons of naphtha, a .

ENVIRONMENTAL EALTH AND AFETY UIDELINES PETROLEUM .

ENVIRONMENTAL EALTH AND AFETY UIDELINES PETROLEUM .

maintenance regimes and plant turnaround protocols, to the extent that the refinery does not exceed 8,000 operating hours/year (corresponding to one month/year of refinery-planned shut-down for general maintenance). This means achieving a Refinery Service Factor of 91 percent (or 8,000 operating hours/24 hours per day x 365 days= 0.91).

Mammoet assists Larsen & Toubro . | Plant & Equipment

Mammoet assists Larsen & Toubro . | Plant & Equipment

Dec 17, 2019 · 2005: PTC 35 installing the Existing RFCC reactor at Orpic refinery, Sohar, Oman. Mammoet has been contracted by Larsen & Toubro (L&T) to support heavy lifting activities during the turnaround of Oman Oil Refineries and Petroleum Industries Company's (Orpic) Sohar Refinery .

Nasir Abbas - Turaround Planner - Sadara Chemical Company .

Nasir Abbas - Turaround Planner - Sadara Chemical Company .

Major maintenance activity worked out was for Reactor, Heater, Column, Exchanger, Vessel, Tank, Pressure safety valve, Pipe repair/replacement, Control Valve overhauling, Compressor, Turbine, Electrical PM, Analyzer PM. Key responsibilities: 1. (Daily maintenance planning). Review maintenance work new notifications on daily basis.

Turnaround Project Planner Primer - LinkedIn SlideShare

Turnaround Project Planner Primer - LinkedIn SlideShare

Nov 07, 2008 · Turnaround project planning and scheduling is an important function that has a direct and dramatic impact on maintenance costs and bottom line profitability of a process plant. Maintenance costs are the result of the expenditure of manpower, equipment and materials.

A dynamic HAZOP case study using the Texas City refinery .

A dynamic HAZOP case study using the Texas City refinery .

Mar 01, 2016 · The initial conditions used for the steady state simulation are those available in published documents about the process conditions at the start-up of the raffinate splitter tower on 23 March at the end of the turn around maintenance (Palacin-Linan, 2005, Chemical Safety BoardUS, 2005, Baker et al., 2007).The simulation covers the period from 0213 h to 1320 h on 23 March 2005, corresponding to .

OSHA Technical Manual (OTM) | Section IV: Chapter 2 .

OSHA Technical Manual (OTM) | Section IV: Chapter 2 .

The catalyst section contains the reactor and regenerator, which, with the standpipe and riser, forms the catalyst circulation unit. . inspection, maintenance, and turnaround activities; and for exposure to hazards such as those related to noise, water-treatment chemicals, and hydrogen sulfide when wastewater is treated in conjunction with .

ind brochure - LinkedIn SlideShare

ind brochure - LinkedIn SlideShare

Jan 15, 2015 · ind brochure 1. Industrial Measurement Division Warner Land Surveys Ltd have been carrying out industrial measurement and critical interface dimensional control works for major refinery shutdowns, both nationally and internationally, for over 18 years.

turnaround maintenance reactor events plenum lift section .

turnaround maintenance reactor events plenum lift section .

turnaround maintenance reactor events plenum lift section refinery ind brochure LinkedIn SlideShare The exact shape of the "as built" new cone section was set out to 1mm accuracy on the existing reactor cone section The cut was carried out in accordance with Warner Land Surveys cut lines and the new cone section was installed This was .

El Dorado Refinery : Matrix Service Company

El Dorado Refinery : Matrix Service Company

The reactor's top head and upper 25 feet of shell were replaced along with the internal plenum, primary and secondary cyclones with inlet nozzle, crossover duct and dip legs. The replacement shell and cyclones were assembled with the refractory installed and thermally cured on a jig stand during the pre-turnaround.

News & Blog | Becht

News & Blog | Becht

Becht News & Blog - Discover Becht Company News and Articles relating to the various Services, Industries and Research & Development efforts of Becht.

Furnace Tubes | Inspectioneering

Furnace Tubes | Inspectioneering

Furnaces are critical pieces of equipment that can have a major impact on process unit safety, reliability, and economics. Therefore, Furnace Tube inspection and maintenance are essential activities for effective asset integrity management at any refinery or petrochemical plant. Furnace tube life and integrity are impacted by several degradation mechanisms depending on the type of service .

US7757493B2 - Fluid catalytic cracking steam pressure .

US7757493B2 - Fluid catalytic cracking steam pressure .

A system and method are provided for recovering power from hot flue gas of a catalyst regenerator in an FCC unit and an integrated fluid catalytic cracking steam pressure letdown. The system includes a flue gas power recovery system including an expander and a turbine for generating power by letting down steam from a higher pressure to a lower pressure for use in a refinery .

Isolation of Process Equipment Procedure

Isolation of Process Equipment Procedure

Raised to Revision 3.0 August 2009 Raised to 3.1 22 August 2009 raised to 3.2 18 November 2009 Raised to 3.3 9 Feb 2010 Issued at Revision 4 28 3 10 Issued at Rev 5 16/10/10 Issued at Rev 5.1 18/05/11 Issued at Rev 5.2 06/09/11 Issued at Rev 6.0 06/05/12